FERC Denies Waiver for Failure to File PURPA Qualifying Facility Self-Certification

May 21, 2018

Reading Time : 1 min

By: Shawn Whites (paralegal)

In cases such as Zeeland’s, by which an entity without a FERC-approved tariff fails to self-certify its QFs, FERC requires that such entities refund the “time value” revenues collected for power sold during a noncompliance period.3 This outcome is typical of how FERC has handled noncompliance with QF regulations since the issuance of Order No. 671 in 2006.4 In that order, FERC stated that a facility should not “be able to claim QF status without having made any filing with [the] Commission” and required that all QFs file either a notice of self-certification or an application for Commission certification before selling power from that facility.5 Fortunately for Zeeland, no refunds were required, since its variable costs exceeded its revenues during its noncompliance period (i.e., it operated at a loss).6

The instant case serves as a reminder that projects must file FERC Form 556 if they intend to claim QF status and its associated regulatory exemptions. This also applies to other FERC forms from time to time applicable to QFs, such as the requirement to file FERC Form 561 (reporting interlocking officer positions). Utilities purchasing power from QFs should likewise make a point of ensuring that project owners and developers are aware of the regulatory requirements associated with QFs.

 


1 18 CFR 202.203(a) (2018).

2 Zeeland Farm Servs., Inc., 163 FERC ¶ 61,115, at P 4 (2018).

3 Id. at P 16.

4 Revised Regs. Governing Small Power Production and Cogen. Facilities, Order No. 671, FERC Stats. & Regs. ¶ 31,203, order on reh’g, Order No. 671-A, FERC Stats. & Regs. ¶ 31,219 (2006).

5 Id. at P 82.

6 See 163 FERC ¶ 61,115 at P 17; see also Zeeland Farm Servs., Inc., Refund Report, Docket Nos. QF17-935-000, et al., at 1 (filed Feb. 14, 2018); Zeeland Farm Servs., Inc., Docket Nos. QF17-935-001, et al. (May 17, 2018) (unpublished letter order accepting refund report).

Share This Insight

Previous Entries

Speaking Energy

June 18, 2026

Today, the Federal Energy Regulatory Commission (FERC) issued tailored show cause orders under section 206 of the Federal Power Act to PJM Interconnection, L.L.C. (PJM), Midcontinent Independent System Operator Inc. (MISO), Southwest Power Pool Inc. (SPP), California Independent System Operator (CAISO), ISO New England Inc. (ISO-NE) and New York Independent System Operator (NYISO), together with their transmission owners, directing each region to justify or reform the tariff provisions governing how data centers and other large loads connect to and receive service from the transmission grid. The orders are part of FERC’s broader response to rapidly increasing electricity demand, particularly from data centers and other large loads, and advance the objectives of the Secretary of Energy’s October 2025 Advance Notice of Proposed Rulemaking (ANOPR) by seeking to accelerate “speed to power” while preserving grid reliability, affordability and consumer protections.

...

Read More

Speaking Energy

July 18, 2026

Akin is proud to serve as a Gold Sponsor of Infocast PowerUp Data Centers – Infrastructure, taking place on July 14 - 16 in Austin, Texas.

...

Read More

Speaking Energy

April 23, 2026

On April 15, 2026, the Federal Energy Regulatory Commission (FERC or the Commission) issued one of the largest enforcement penalty orders in its history, finding that American Efficient, LLC (American Efficient) and its affiliates engaged in a decade‑long fraudulent scheme involving offering energy efficiency resources (EERs) over which they had no contractual authority into the PJM Interconnection, L.L.C. (PJM) and Midcontinent Independent System Operator, Inc. (MISO) capacity markets.1

...

Read More

Speaking Energy

April 7, 2026

Oil & gas companies are adapting swiftly to the administration’s energy dominance agenda, replacing net zero commitments with strategic opportunities across three emerging revenue streams. The AI-driven data center boom is fueling unprecedented demand for reliable onsite power, with traditional energy companies leveraging their natural gas resources and infrastructure expertise to build dedicated generation facilities and enter construction joint ventures. Major oil producers are simultaneously exploiting their subsurface exploration capabilities to expand into critical mineral supply chains essential for battery technologies, electronics and aerospace applications. 

...

Read More

© 2026 Akin Gump Strauss Hauer & Feld LLP. All rights reserved. Attorney advertising. This document is distributed for informational use only; it does not constitute legal advice and should not be used as such. Prior results do not guarantee a similar outcome. Akin is the practicing name of Akin Gump LLP, a New York limited liability partnership authorized and regulated by the Solicitors Regulation Authority under number 267321. A list of the partners is available for inspection at Eighth Floor, Ten Bishops Square, London E1 6EG. For more information about Akin Gump LLP, Akin Gump Strauss Hauer & Feld LLP and other associated entities under which the Akin Gump network operates worldwide, please see our Legal Notices page.