FERC Denies Waiver for Failure to File PURPA Qualifying Facility Self-Certification

May 21, 2018

Reading Time : 1 min

By: Shawn Whites (paralegal)

In cases such as Zeeland’s, by which an entity without a FERC-approved tariff fails to self-certify its QFs, FERC requires that such entities refund the “time value” revenues collected for power sold during a noncompliance period.3 This outcome is typical of how FERC has handled noncompliance with QF regulations since the issuance of Order No. 671 in 2006.4 In that order, FERC stated that a facility should not “be able to claim QF status without having made any filing with [the] Commission” and required that all QFs file either a notice of self-certification or an application for Commission certification before selling power from that facility.5 Fortunately for Zeeland, no refunds were required, since its variable costs exceeded its revenues during its noncompliance period (i.e., it operated at a loss).6

The instant case serves as a reminder that projects must file FERC Form 556 if they intend to claim QF status and its associated regulatory exemptions. This also applies to other FERC forms from time to time applicable to QFs, such as the requirement to file FERC Form 561 (reporting interlocking officer positions). Utilities purchasing power from QFs should likewise make a point of ensuring that project owners and developers are aware of the regulatory requirements associated with QFs.

 


1 18 CFR 202.203(a) (2018).

2 Zeeland Farm Servs., Inc., 163 FERC ¶ 61,115, at P 4 (2018).

3 Id. at P 16.

4 Revised Regs. Governing Small Power Production and Cogen. Facilities, Order No. 671, FERC Stats. & Regs. ¶ 31,203, order on reh’g, Order No. 671-A, FERC Stats. & Regs. ¶ 31,219 (2006).

5 Id. at P 82.

6 See 163 FERC ¶ 61,115 at P 17; see also Zeeland Farm Servs., Inc., Refund Report, Docket Nos. QF17-935-000, et al., at 1 (filed Feb. 14, 2018); Zeeland Farm Servs., Inc., Docket Nos. QF17-935-001, et al. (May 17, 2018) (unpublished letter order accepting refund report).

Share This Insight

Previous Entries

Speaking Energy

February 10, 2026

The global energy sector enters 2026 amid major policy shifts, geopolitical tension and evolving market dynamics. The Trump administration’s reversal of Biden-era climate initiatives and renewed emphasis on domestic production have reshaped the policy landscape, offering a more favorable regulatory environment even as conflicts abroad, oil price volatility and shifting trade policies tempered deal activity through 2025.

...

Read More

Speaking Energy

January 22, 2026

On January 16, 2026, the National Energy Dominance Council (NDEC) and governors from each of the 13 states in PJM issued a Statement of Principles urging PJM Interconnection, L.L.C. (PJM) to hold an emergency backstop auction and take other measures to support the entry of new capacity to preserve the reliability of the PJM region. The Statement of Principles calls on PJM to expeditiously file with the Federal Energy Regulatory Commission (FERC or the Commission) tariff revisions that would overhaul aspects of PJM’s market rules to address rising electricity prices and growing reliability risks in the PJM region. The Statement of Principles comes at a time of growing concern that PJM will not have sufficient capacity in the coming years to meet demand due to the retirement of existing generation resources, the glacial pace of new entry and projected increased demand associated with data center development.

...

Read More

Speaking Energy

December 21, 2025

On December 19, 2025, the Federal Energy Regulatory Commission (FERC or the Commission) issued its much-anticipated order on show cause proceeding concerning the co-location of generation and load within the PJM Interconnection, L.L.C. (PJM) market.[1] In the order, the Commission finds that PJM’s tariff is unjust and unreasonable because it does not provide sufficient clarity on the rates, terms, and conditions of service applicable to generators serving Co-Located Load and does not include transmission services appropriate for customers that are willing and able to limit their use of the transmission system in certain conditions. 

...

Read More

Speaking Energy

November 25, 2025

We are pleased to share the program materials and a recording of Akin’s recently presented webinar, “Navigating the Evolving Landscape of Corporate PPAs.”

...

Read More

© 2026 Akin Gump Strauss Hauer & Feld LLP. All rights reserved. Attorney advertising. This document is distributed for informational use only; it does not constitute legal advice and should not be used as such. Prior results do not guarantee a similar outcome. Akin is the practicing name of Akin Gump LLP, a New York limited liability partnership authorized and regulated by the Solicitors Regulation Authority under number 267321. A list of the partners is available for inspection at Eighth Floor, Ten Bishops Square, London E1 6EG. For more information about Akin Gump LLP, Akin Gump Strauss Hauer & Feld LLP and other associated entities under which the Akin Gump network operates worldwide, please see our Legal Notices page.