Alive, for Now: D.C. Circuit Restores Obama-era Risk Management Plan Amendments

Sep 28, 2018

Reading Time : 1 min

By: Stacey H. Mitchell, David H. Quigley, Bryan C. Williamson, law clerk (not admitted to practice)

Specifically, these provisions require an estimated 12,542 regulated facilities across all sectors to coordinate and document emergency response needs with local organizations, as well as inform federal and state agencies about accidental releases.3 In addition, facilities must collect and maintain more information regarding their operations, train and educate more employees and conduct more comprehensive incident investigations following accidents.4 Although these provisions are now enforceable, EPA has proposed changes to rescind many of the now-effective requirements.5


1 Air Alliance Houston, et al. v. EPA, No. 17-1155 (D.C. Cir. 2018).

2  Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act, 82 Fed. Reg. 4594 (January 13, 2017).

3 Id. at 4596.

4 See generally supra note 2.

5 Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act, 83 Fed. Reg. 24850 (May 30, 2018).

Share This Insight

Previous Entries

Speaking Energy

June 25, 2026

On June 18, 2026, the Federal Energy Regulatory Commission (FERC or the Commission) issued an order to the California Independent System Operator Corporation (CAISO) directing CAISO and CAISO transmission owners to show cause as to why CAISO’s tariff should not be found to be unjust and unreasonable (California Indep. Sys. Operator Corp., 195 FERC ¶ 61,214 (2026) (the Order)) because it fails to sufficiently:

...

Read More

Speaking Energy

June 24, 2026

On June 18, 2026, the Federal Energy Regulatory Commission (FERC or the Commission) issued an order to New York Independent System Operator, Inc. (NYISO) directing NYISO and NYISO transmission owners to show cause as to why NYISO’s tariff should not be found to be unjust and unreasonable (New York Independent System Operator, Inc., 195 FERC ¶ 61,216 (2026) (Order)) because it fails to sufficiently:

...

Read More

Speaking Energy

June 23, 2026

On June 18, 2026, the Federal Energy Regulatory Commission (FERC or the Commission) issued an order to Midcontinent Independent System Operator, Inc. (MISO) directing MISO and MISO transmission owners to show cause as to why MISO’s tariff should not be found to be unjust and unreasonable (Midcontinent Independent System Operator, Inc., 195 FERC ¶ 61,212 (2026) (Order)) because it fails to sufficiently:

...

Read More

Speaking Energy

June 23, 2026

On June 18, 2026, the Federal Energy Regulatory Commission (FERC or the Commission) issued an order to PJM Interconnection, L.L.C. directing PJM and PJM transmission owners to show cause as to why PJM’s tariff should not be found to be unjust and unreasonable (PJM Interconnection, L.L.C., 195 FERC ¶ 61,211 (2026) (the Order)) because it fails to sufficiently:

...

Read More

© 2026 Akin Gump Strauss Hauer & Feld LLP. All rights reserved. Attorney advertising. This document is distributed for informational use only; it does not constitute legal advice and should not be used as such. Prior results do not guarantee a similar outcome. Akin is the practicing name of Akin Gump LLP, a New York limited liability partnership authorized and regulated by the Solicitors Regulation Authority under number 267321. A list of the partners is available for inspection at Eighth Floor, Ten Bishops Square, London E1 6EG. For more information about Akin Gump LLP, Akin Gump Strauss Hauer & Feld LLP and other associated entities under which the Akin Gump network operates worldwide, please see our Legal Notices page.