Bridging the Bid-Ask Spread in the Oil Patch

Jan 25, 2016

Reading Time : 1 min

All-cash transactions, which have historically dominated the upstream M&A landscape, certainly do not facilitate a further narrowing of this bid-ask spread. On one hand, sellers are concerned that they will sell low and miss out on value associated with the eventual price rebound. On the other hand, buyers may potentially be more pessimistic than their counterparts on the timing of the rebound. In this environment, where buyers and sellers often still do not see eye to eye, many are actively considering mechanisms, such as earnouts, to help bridge the gap.

The simplest form of an earnout in an upstream transaction is linking post closing payments to the magnitude and timing of the increase in commodity prices. This mechanism alleviates concerns with respect to both sellers and buyers: the former because they can now participate in a portion of the upside and the latter because additional consideration is due only if the price rebounds in line with agreed-upon parameters.

While an earnout presents the parties with a potential avenue to align expectations with respect to a price rebound, financial sponsors should carefully consider how an earnout might impact other aspects of the transaction. For example, a buyer concerned about the financial ability of a distressed seller to backstop its indemnification obligations could negotiate that earnout payments owed to the seller are offset against indemnification payments owed to the buyer. Buyers hiring key employees to continue to operate the oil and gas assets should also consider whether such employees need to remain with the assets as a condition precedent to earnout payments being made. While such other considerations may potentially result in an earnout structure more complex than what parties had originally envisioned, a carefully constructed and well-drafted mechanism can provide both sides with the assurance and flexibility that is often required to get a deal signed in this uncertain market.

Share This Insight

Previous Entries

Speaking Energy

November 12, 2025

On November 7, 2025, the New York Department of Environmental Conservation (NYSDEC) and the New Jersey Department of Environmental Protection (NJDEP) reversed their prior positions and approved Clean Water Act (CWA) Section 401 Water Quality Certifications and other environmental permits for the Transcontinental Gas Pipeline Company’s (Transco) Northeast Supply Enhancement Project (NESE). NESE is a 25-mile natural gas pipeline expansion project certificated by the Federal Energy Regulatory Commission (FERC) that is intended to deliver 400,000 dekatherms per day of natural gas produced in Pennsylvania to local distribution company customers in New York City through new facilities in Middlesex County, New Jersey and an underwater segment traversing the Raritan and Lower New York Bays.

...

Read More

Speaking Energy

November 6, 2025

The market for the direct procurement of energy by commercial and industrial buyers has been active in the U.S. for a decade.  In years past, buyers often engaged in such purchases on a voluntary basis to achieve their goals to use renewable energy.  These days, C&I buyers are turning to direct procurement or self-supply to obtain a reliable source of energy.  Sufficient and accessible energy from a local utility may not be available or may be materially delayed or trigger significant capital costs.  This is a material change driven in part by increased demand for electricity, including demand from data centers, EV infrastructure and industrial development.       

...

Read More

Speaking Energy

October 27, 2025

On October 23, 2025, the Secretary of the U.S. Department of Energy (DOE) directed the Federal Energy Regulatory Commission (FERC) to conduct a rulemaking to assert jurisdiction over load interconnections to the bulk electric transmission system and establish standardized procedures for the interconnection of large loads.1 The Directive included an advanced notice of proposed rulemaking (ANOPR) that sets forth the legal justification for asserting jurisdiction over transmission-level load interconnections and fourteen principles that should inform FERC’s rulemaking process. The Secretary has directed FERC to take “final action” on the Directive no later than April 30, 2026.

...

Read More

Speaking Energy

October 24, 2025

On October 21, 2025, the U.S. Department of Energy (DOE) issued a final order (DOE/FECM Order No. 5264-A1) granting Venture Global CP2 LNG, LLC long-term authorization to export up to 1,446 billion cubic feet per year of domestically produced liquefied natural gas (LNG) from its Louisiana facility to countries without a free trade agreement with the United States (Non-FTA Countries). The final order follows a March 2025 Conditional Order,2 which issued while DOE was still completing its review of the agency’s 2024 LNG Export Study.3 The final order confirms that the project’s export volume and term authorization (through December 31, 2050) are unchanged, but provides for a three-year “make-up period” to allow export of any approved volume not shipped during the original term.

...

Read More

© 2025 Akin Gump Strauss Hauer & Feld LLP. All rights reserved. Attorney advertising. This document is distributed for informational use only; it does not constitute legal advice and should not be used as such. Prior results do not guarantee a similar outcome. Akin is the practicing name of Akin Gump LLP, a New York limited liability partnership authorized and regulated by the Solicitors Regulation Authority under number 267321. A list of the partners is available for inspection at Eighth Floor, Ten Bishops Square, London E1 6EG. For more information about Akin Gump LLP, Akin Gump Strauss Hauer & Feld LLP and other associated entities under which the Akin Gump network operates worldwide, please see our Legal Notices page.