The Allegation

The OE Staff Report appended to the OSC details OE’s allegations with respect to ETRACOM’s virtual trading activities. OE alleges that in May 2011, ETRACOM submitted virtual supply offers at the New Melones intertie in CAISO in order to affect power prices to benefit ETRACOM’s CRRs at that location. Virtual transactions allow a market participant to make financial sales or purchases of energy in the day-ahead market, with the requirement that they buy back (or sell back) that energy in the real-time market (making or losing money based on the day-ahead/real-time price differential). CRRs are a financial product offered by CAISO which settles off the difference in the day-ahead congestion costs between two locations (a source location and a sink location). The New Melones intertie is located in eastern central California and connects a hydroelectric generating resource located in the SMUD/WAPA balancing authority area with CAISO. In 2011, only WAPA could submit bids for physical imports or exports at New Melones, but CAISO still allowed for virtual bidding at the intertie. 

OE states that ETRACOM’s CRR positions sourced at New Melones were very profitable in early May, but on May 8 began to experience a decline in profitability due to unexplained export congestion at New Melones. OE alleges that between May 14 and 31 – in response to that decline in profitability – ETRACOM submitted and cleared uneconomic virtual supply offers with the intent to benefit its New Melones-sourced CRRs by creating import congestion and lowering the day-ahead price at New Melones. OE claims that ETRACOM’s virtual supply transactions during the relevant time consistently lost money, but that ETRACOM’s profits on its New Melones CRR positions more than doubled. According to OE, ETRACOM’s virtual trading activities lost $42,481, but enabled ETRACOM to earn an estimated $315,072 in unjust profits related to its CRR positions. OE states that ETRACOM ceased trading virtual supply at New Melones on May 31, and that its June CRR positions were substantially smaller. 

Next Steps

ETRACOM and Rosenberg have 30 days to respond to the OSC and the allegations set forth in the OE Staff Report. The OE Staff Report notes that ETRACOM has previously argued that the virtual trading strategy at issue was not manipulative, but rather was intended to profit from a hydroelectric runoff event it anticipated would occur in late May 2011. In the Staff Report, OE dismisses this explanation as inconsistent with the evidence. The Staff Report notes that ETRACOM has also argued that flaws in CAISO’s administration of the New Melones node were responsible for the market price outcomes – a defense OE Staff dismisses as a post hoc rationalization not reflective of ETRACOM’s intent at the time of its trading. ETRACOM will likely raise these and other defenses when it responds to the OSC.

Federal District Court Litigation in California Possible

The OSC directs ETRACOM and Rosenberg to make a procedural election under section 31(d) of the Federal Power Act within 30 days. Under section 31(d), ETRACOM and Rosenberg can elect either to have a hearing before an administrative law judge prior to the Commission issuing an order assessing civil penalties (with such order being subject to traditional appellate review procedures for agency orders) or, alternatively, to have the Commission assess any civil penalties immediately, without an agency hearing. If ETRACOM and Rosenberg elect to have the Commission assess any civil penalties immediately, without an agency hearing, the Commission can only enforce the penalty by initiating an action in federal district court, where the district court has authority to review the matter de novo

If ETRACOM and Rosenberg elect the district court de novo review procedural option (as all other subjects of electricity market manipulation cases have done to date) rather than an agency hearing, and the Commission assesses a civil penalty, it is likely that FERC will consider filing its district court enforcement action in the United States District Court for the Eastern District of California, which is where CAISO is located. FERC has obtained several favorable rulings from that court in its pending enforcement action against Barclays Bank involving allegations of electricity market manipulation in the western U.S. during the 2006-2008 time period. In a May 2015 order denying Barclays’ motion to dismiss, the court found in FERC’s favor on several issues relating to, among other things, manipulation law, venue, jurisdiction and FERC’s authority to penalize individuals. The court in the Barclays case has also ruled that the statutory de novo review of FERC’s civil penalty assessment does not necessarily require a trial – a finding Barclays is presently seeking to appeal to the Ninth Circuit. While FERC has brought similar enforcement cases in federal district courts in Massachusetts, Virginia and the District of Columbia, those courts have not yet addressed these threshold substantive and procedural issues. Thus, it would not be surprising if FERC seeks to avail itself of the favorable decisions it has obtained in the Barclays case, particularly since this case involves the CAISO market. 

Share This Insight

Previous Entries

Speaking Energy

October 27, 2025

On October 23, 2025, the Secretary of the U.S. Department of Energy (DOE) directed the Federal Energy Regulatory Commission (FERC) to conduct a rulemaking to assert jurisdiction over load interconnections to the bulk electric transmission system and establish standardized procedures for the interconnection of large loads.1 The Directive included an advanced notice of proposed rulemaking (ANOPR) that sets forth the legal justification for asserting jurisdiction over transmission-level load interconnections and fourteen principles that should inform FERC’s rulemaking process. The Secretary has directed FERC to take “final action” on the Directive no later than April 30, 2026.

...

Read More

Speaking Energy

October 24, 2025

On October 21, 2025, the U.S. Department of Energy (DOE) issued a final order (DOE/FECM Order No. 5264-A1) granting Venture Global CP2 LNG, LLC long-term authorization to export up to 1,446 billion cubic feet per year of domestically produced liquefied natural gas (LNG) from its Louisiana facility to countries without a free trade agreement with the United States (Non-FTA Countries). The final order follows a March 2025 Conditional Order,2 which issued while DOE was still completing its review of the agency’s 2024 LNG Export Study.3 The final order confirms that the project’s export volume and term authorization (through December 31, 2050) are unchanged, but provides for a three-year “make-up period” to allow export of any approved volume not shipped during the original term.

...

Read More

Speaking Energy

October 9, 2025

On October 1, 2025, the Federal Energy Regulatory Commission (FERC or the Commission) issued Order No. 914 amending certain Commission regulations to incorporate a conditional sunset date in compliance with the Trump administration’s April 2025 Executive Order, “Zero-Based Regulatory Budgeting to Unleash American Energy” (the EO).

...

Read More

Speaking Energy

October 8, 2025

Akin is pleased to serve as a gold sponsor for Infocast’s Energy Independence Summit in Houston, October 21-23. Energy partner Charlie Ofner will moderate the Macroeconomics of Domestic Energy Independence panel, projects & energy transition partner Shariff Barakat will lead Opportunities in US Manufacturing: How Big, How Fast, How FEOC?, and counsel Taha Qureshi will guide the discussion on Cornerstones for Energy Independence: Investing in Grid Security & Cybersecurity.

...

Read More

Speaking Energy

October 6, 2025

As of October 6, 2025, the Federal Energy Regulatory Commission (FERC) continues to operate despite the lapse in appropriations that resulted in a government shutdown on October 1, 2025. While FERC receives appropriations from Congress, it primarily is self-funded through fees and charges obtained from the industries it regulates, offsetting its total costs. Hence, during prior government shutdowns in 2018 and 2013, the agency was able to continue operations. However, FERC published a plan for operating in the event of a lapse in appropriations on September 30, 2025, available here

...

Read More

Speaking Energy

September 8, 2025

On September 4, 2025, the Senate Energy and Natural Resources Committee convened a hearing to consider the nominations of Laura Swett and David LaCerte to serve as commissioners at the Federal Energy Regulatory Commission (FERC or Commission). Swett is a former FERC Staff that served as legal and policy advisor to former FERC Chairman Kevin McIntyre and Commission Bernard McNamee. LaCerte is an attorney in private practice that previously held positions at the Chemical Safety and Hazard Investigation Board and the Louisiana Department of Veterans Affairs.

...

Read More

Speaking Energy

September 9, 2025

On August 29, 2025, Christopher Wright, the Secretary of the U.S. Department of Energy (DOE) submitted a proposal to the Federal Energy Regulatory Commission (FERC) under section 403 of the Department of Energy Organization Act (DOE Organization Act), asking that FERC terminate its long-running proceeding in Docket No. PL18-1, which addresses proposed updates to its policy statement on the Certification of New Interstate Natural Gas Facilities. The docket resulted in a draft policy statement that has never been finalized, nor relied upon by FERC in a published order, but would require FERC to consider environmental impacts and potential mitigation prior to making a public interest determination under the Natural Gas Act (NGA). The Secretary asks FERC to rescind the draft policy statement in its entirety to remove any uncertainty in gas infrastructure development. Rescission would require FERC to initiate a new docket and develop a new record should it want to reinitiate similar policy changes in the future.

...

Read More

Speaking Energy

August 15, 2025

On August 8, 2025, the Federal Energy Regulatory Commission (FERC) issued an enforcement order in Skye MS, LLC (Skye) and levied a $45,000 civil penalty on an intrastate pipeline operator in Mississippi, resolving an investigation into the operator’s violations of section 311 (Section 311) of the Natural Gas Policy Act (NGPA). FERC faulted the operator for providing a Section 311 transportation service without timely filing a Statement of Operating Conditions (SOC) and obtaining FERC’s approval for the transportation rates. Section 311 permits intrastate pipelines to transport interstate gas “on behalf of” interstate pipelines without becoming subject to FERC’s more extensive Natural Gas Act (NGA) jurisdiction, but requires the intrastate pipeline to have an SOC stating the rates and terms and conditions of service on file with FERC within 30 days of providing the interstate service. Under the NGPA, Section 311 rates must be “fair and equitable” and approved by FERC. In Skye, FERC stated that the operator began providing Section 311 service on certain pipeline segments in Mississippi in May 2023, following their acquisition from another Section 311 operator, but did not file an SOC with FERC until April 2025. The order ties the penalty to the approximately two-year delay between commencement of the Section 311 service and the SOC filing date. The pipeline operator was also ordered to provide an annual compliance report and to abide by additional verification requirements related to the filing of its FERC Form No. 549D, the Quarterly Transportation & Storage Report for Intrastate Natural Gas and Hinshaw Pipelines.

...

Read More

© 2025 Akin Gump Strauss Hauer & Feld LLP. All rights reserved. Attorney advertising. This document is distributed for informational use only; it does not constitute legal advice and should not be used as such. Prior results do not guarantee a similar outcome. Akin is the practicing name of Akin Gump LLP, a New York limited liability partnership authorized and regulated by the Solicitors Regulation Authority under number 267321. A list of the partners is available for inspection at Eighth Floor, Ten Bishops Square, London E1 6EG. For more information about Akin Gump LLP, Akin Gump Strauss Hauer & Feld LLP and other associated entities under which the Akin Gump network operates worldwide, please see our Legal Notices page.