The case arose from a hydroelectric relicensing proceeding.  The Smith Lake Improvement and Stakeholders Association (“Association”), composed primarily of persons owning property abutting Alabama Power Company’s (“Alabama Company”) Smith Lake Development, intervened in the Smith Lake relicensing proceeding at FERC.  The Association objected to Alabama Power’s proposal to maintain the lake at the same water levels as under its prior license.  FERC denied the Association’s proposed water-level change and issued a new license authorizing Alabama Power to operate under existing water-level benchmarks.  The Association timely filed for rehearing of the license order.  FERC affirmed the license order with regard to the water levels that interested the Association, but issued a clarification on another matter.  The Association then filed a second rehearing request, which FERC summarily denied, stating that its first rehearing request had addressed the Association’s arguments.  Sixty days after FERC’s summary denial of the second rehearing petition, the Association petitioned the D.C. Circuit for review.

The D.C. Circuit concluded that it lacked jurisdiction to hear the petition.  Under Section 313(b) of the Federal Power Act (FPA), a party petitioning for judicial review of a FERC order must file its petition within 60 days.5  However, although the Association had filed its petition within 60 days of the second rehearing order, the filing occurred 124 days after the first rehearing order.  As the court explained, it was the first rehearing order that started the 60-day clock, and the second request for rehearing did not toll it.

Under FPA 313(b), an appellate court has jurisdiction to review a FERC order only when a petitioner has exhausted its administrative remedies and then petitions the court for review within 60 days.  Normally, filing a petition for rehearing, and receiving an order denying rehearing from FERC, serves to exhaust administrative remedies.  However, “a second rehearing petition must be filed [with FERC] if—and only if—the first rehearing order modified the results of [FERC’s initial order] in a significant way.”6  The “significant” modification must also be a change in the outcome of the case, and not merely the reasoning.7  In Smith Lake, however, FERC’s first order on rehearing did not alter the outcome of the license order with regard to the issues of concern to the Association.  Therefore, the Association was not required to file a second request for rehearing to exhaust its administrative remedies.  Instead, pursuant to FPA 313(b), the Association had to file for review within 60 days of the first rehearing order.  Unfortunately for the Association, it chose to file another request for rehearing, perhaps because FERC’s first order on rehearing included a notation that “‘[t]he licensee’s failure to file a request for rehearing shall constitute acceptance of this order.’”8  In their statement accompanying the court’s denial of rehearing en banc, the judges noted that this was not the first time this had occurred, and it advised that “it would help interested parties to its decisions if FERC took greater care with this type of guidance.”9

In its briefs, the Association raised a further complication that the court attempted to address.  The Association described a “trap” where FERC, in an order on rehearing, does not change the outcome of its prior order, but does change its reasoning.  Under existing precedent, a party cannot “simultaneously seek both agency reconsideration and judicial review of an agency’s order.”10  However, FPA 313(b) states that a party cannot seek review of a FERC order if it has not previously objected to that order in a request for rehearing.11  So, what should a party do if the request for rehearing alters only the FERC’s reasoning, and the party objects to that new reasoning?

Drawing on precedent under the FPA’s sister statute, the Natural Gas Act, the D.C. Circuit concluded that the petitioner caught in this “trap” should petition for review, rather than seek rehearing.  “[W]hen a party seeks judicial review following a rehearing order that changes the reasoning without altering the result,”12 then that party may have reasonable grounds under the FPA for not having raised its objections earlier13 “and therefore be entitled to consideration of those arguments.”14  In the amended version of the order, the court clarified its discussion of the hypothetical situation where the party is unsure whether or not a change to the outcome in a rehearing order is “significant.”  In that case, the court urges parties to file a petition with the court, based again on having “reasonable grounds” for not having raised their arguments with the FERC a second time.


1 Smith Lake Improvement and Stakeholders Ass’n v. FERC, No. 13-1074 (D.C. Cir. Sept. 26, 2014). 

2 See Brief for Respondent, Smith Lake Improvement and Stakeholders Ass’n v. FERC, No. 13-1074.

3 Order, Smith Lake Improvement and Stakeholders Ass’n v. FERC, No. 13-1074.

4 The court also reissued the September opinion, amended to recognize that the requirement that requests for rehearing be filed at FERC within 30 days is a statutory, jurisdictional requirement.

5 16 U.S.C. 825l(b) (2012).

6 Smith Lake Improvement and Stakeholders Ass’n v. FERC, No. 13-1074, slip op. at 4 (D.C. Cir. Jan. 30, 2015) (“Amended Order”) (internal quotes omitted) (emphasis added).

7 Id.

8 Statement of Cir. Judges Brown and Wilkins and Senior Cir. Judge Silberman at 2, Smith Lake Improvement and Stakeholders Ass’n v. FERC, No. 13-1074 (quoting Alabama Power Co., 130 FERC ¶ 62,271, at 64,719 (2010)).

9 Id.

10 Tennessee Gas Pipeline Co. v. FERC, 9 F.3d 980, 980 (D.C. Cir. 1993).

11 16 U.S.C. 825l(b).

12 Amended Order at 6.

13 16 U.S.C. 825l(b) (2012).

14 Amended Order at 6-7. 

Share This Insight

Previous Entries

Speaking Energy

August 15, 2025

On August 8, 2025, the Federal Energy Regulatory Commission (FERC) issued an enforcement order in Skye MS, LLC (Skye) and levied a $45,000 civil penalty on an intrastate pipeline operator in Mississippi, resolving an investigation into the operator’s violations of section 311 (Section 311) of the Natural Gas Policy Act (NGPA). FERC faulted the operator for providing a Section 311 transportation service without timely filing a Statement of Operating Conditions (SOC) and obtaining FERC’s approval for the transportation rates. Section 311 permits intrastate pipelines to transport interstate gas “on behalf of” interstate pipelines without becoming subject to FERC’s more extensive Natural Gas Act (NGA) jurisdiction, but requires the intrastate pipeline to have an SOC stating the rates and terms and conditions of service on file with FERC within 30 days of providing the interstate service. Under the NGPA, Section 311 rates must be “fair and equitable” and approved by FERC. In Skye, FERC stated that the operator began providing Section 311 service on certain pipeline segments in Mississippi in May 2023, following their acquisition from another Section 311 operator, but did not file an SOC with FERC until April 2025. The order ties the penalty to the approximately two-year delay between commencement of the Section 311 service and the SOC filing date. The pipeline operator was also ordered to provide an annual compliance report and to abide by additional verification requirements related to the filing of its FERC Form No. 549D, the Quarterly Transportation & Storage Report for Intrastate Natural Gas and Hinshaw Pipelines.

...

Read More

Speaking Energy

August 6, 2025

In Sierra Club v. FERC, No. 24-1199 (D.C. Cir. Aug. 1, 2025), the U.S. Court of Appeals for the District of Columbia Circuit (D.C. Circuit) upheld the Federal Energy Regulatory Commission’s (FERC) approval of a 1,000-foot natural gas pipeline segment crossing the United States-Mexico border (the Border Pipeline) under section 3 of the Natural Gas Act (NGA), rejecting environmental groups’ challenges that FERC improperly limited its analysis under both the NGA and the National Environmental Policy Act (NEPA), as related to a 155-mile intrastate “Connector Pipeline” constructed upstream of the Border Pipeline in Texas.

...

Read More

Speaking Energy

July 17, 2025

On July 15, 2025, the Federal Energy Regulatory Commission (FERC or Commission) issued an order1 proposing to eliminate the soft price cap of $1,000 per megawatt-hour (MWh) for bilateral spot sales in the Western Electricity Coordinating Council (WECC) that was implemented following the California energy crisis. If adopted, the Commission’s proposal would eliminate the requirement that sellers make a filing with FERC cost justifying spot market sales in excess of the soft price cap, which have become increasingly common in recent years as market conditions have continued to tighten throughout the West. Eliminating the WECC soft price cap would provide sellers that make sales during periods when prices exceed the cap greater certainty that their sales will not be second guessed after the fact.

...

Read More

Speaking Energy

June 25, 2025

On June 4–5, 2025, the Federal Energy Regulatory Commission (FERC or Commission) hosted a commissioner-led technical conference to discuss resource adequacy challenges facing regional transmission organizations and independent system operators (RTO). The conference is a response to the growing concern that multiple RTO regions across the country may not have sufficient supply available in the coming years to meet demand due to resource retirements, the pace of new generation entry and higher load growth arising from the construction of data centers and reindustrialization.

...

Read More

Speaking Energy

June 12, 2025

We are pleased to share the presentation slide deck and a recording of Akin’s recently presented webinar, “Navigating U.S. Policy Shifts in the Critical Minerals Sector.”

...

Read More

Speaking Energy

June 10, 2025

On June 4, 2025, the U.S. Department of Transportation’s (DOT) Pipeline and Hazardous Materials Safety Administration (PHMSA) announced revisions to its procedures for pipeline safety enforcement actions. The changes, outlined in two new policy memoranda from PHMSA’s Office of the Chief Counsel (PHC), aim to enhance due process protections for pipeline operators by clarifying how civil penalties are calculated and expanding the disclosure of agency records in enforcement proceedings.

...

Read More

Speaking Energy

May 22, 2025

On May 19, 2025, the Department of Energy (DOE) finalized its 2024 LNG Export Study: Energy, Economic and Environmental Assessment of U.S. LNG Exports (the 2024 Study) through the release of a Response to Comments on the 2024 Study. The Response to Comments concludes that the 2024 Study, as augmented through public comments submitted on or before March 20, 2025, supporting a finding that liquefied natural gas (LNG) exports serve the public interest. With the comment process complete, DOE will move forward with final orders on pending applications to export LNG to non-free trade agreement (non-FTA) countries.

...

Read More

Speaking Energy

May 20, 2025

On Thursday, May 15, the Senate Commerce, Science & Transportation Subcommittee on Surface Transportation, Freight, Pipelines and Safety held a hearing titled, “Pipeline Safety Reauthorization: Ensuring the Safe and Efficient Movement of American Energy.” The hearing examined legislative priorities for reauthorizing the Pipeline and Hazardous Materials Safety Administration (PHMSA).

...

Read More

© 2025 Akin Gump Strauss Hauer & Feld LLP. All rights reserved. Attorney advertising. This document is distributed for informational use only; it does not constitute legal advice and should not be used as such. Prior results do not guarantee a similar outcome. Akin is the practicing name of Akin Gump LLP, a New York limited liability partnership authorized and regulated by the Solicitors Regulation Authority under number 267321. A list of the partners is available for inspection at Eighth Floor, Ten Bishops Square, London E1 6EG. For more information about Akin Gump LLP, Akin Gump Strauss Hauer & Feld LLP and other associated entities under which the Akin Gump network operates worldwide, please see our Legal Notices page.