The case arose from a hydroelectric relicensing proceeding.  The Smith Lake Improvement and Stakeholders Association (“Association”), composed primarily of persons owning property abutting Alabama Power Company’s (“Alabama Company”) Smith Lake Development, intervened in the Smith Lake relicensing proceeding at FERC.  The Association objected to Alabama Power’s proposal to maintain the lake at the same water levels as under its prior license.  FERC denied the Association’s proposed water-level change and issued a new license authorizing Alabama Power to operate under existing water-level benchmarks.  The Association timely filed for rehearing of the license order.  FERC affirmed the license order with regard to the water levels that interested the Association, but issued a clarification on another matter.  The Association then filed a second rehearing request, which FERC summarily denied, stating that its first rehearing request had addressed the Association’s arguments.  Sixty days after FERC’s summary denial of the second rehearing petition, the Association petitioned the D.C. Circuit for review.

The D.C. Circuit concluded that it lacked jurisdiction to hear the petition.  Under Section 313(b) of the Federal Power Act (FPA), a party petitioning for judicial review of a FERC order must file its petition within 60 days.5  However, although the Association had filed its petition within 60 days of the second rehearing order, the filing occurred 124 days after the first rehearing order.  As the court explained, it was the first rehearing order that started the 60-day clock, and the second request for rehearing did not toll it.

Under FPA 313(b), an appellate court has jurisdiction to review a FERC order only when a petitioner has exhausted its administrative remedies and then petitions the court for review within 60 days.  Normally, filing a petition for rehearing, and receiving an order denying rehearing from FERC, serves to exhaust administrative remedies.  However, “a second rehearing petition must be filed [with FERC] if—and only if—the first rehearing order modified the results of [FERC’s initial order] in a significant way.”6  The “significant” modification must also be a change in the outcome of the case, and not merely the reasoning.7  In Smith Lake, however, FERC’s first order on rehearing did not alter the outcome of the license order with regard to the issues of concern to the Association.  Therefore, the Association was not required to file a second request for rehearing to exhaust its administrative remedies.  Instead, pursuant to FPA 313(b), the Association had to file for review within 60 days of the first rehearing order.  Unfortunately for the Association, it chose to file another request for rehearing, perhaps because FERC’s first order on rehearing included a notation that “‘[t]he licensee’s failure to file a request for rehearing shall constitute acceptance of this order.’”8  In their statement accompanying the court’s denial of rehearing en banc, the judges noted that this was not the first time this had occurred, and it advised that “it would help interested parties to its decisions if FERC took greater care with this type of guidance.”9

In its briefs, the Association raised a further complication that the court attempted to address.  The Association described a “trap” where FERC, in an order on rehearing, does not change the outcome of its prior order, but does change its reasoning.  Under existing precedent, a party cannot “simultaneously seek both agency reconsideration and judicial review of an agency’s order.”10  However, FPA 313(b) states that a party cannot seek review of a FERC order if it has not previously objected to that order in a request for rehearing.11  So, what should a party do if the request for rehearing alters only the FERC’s reasoning, and the party objects to that new reasoning?

Drawing on precedent under the FPA’s sister statute, the Natural Gas Act, the D.C. Circuit concluded that the petitioner caught in this “trap” should petition for review, rather than seek rehearing.  “[W]hen a party seeks judicial review following a rehearing order that changes the reasoning without altering the result,”12 then that party may have reasonable grounds under the FPA for not having raised its objections earlier13 “and therefore be entitled to consideration of those arguments.”14  In the amended version of the order, the court clarified its discussion of the hypothetical situation where the party is unsure whether or not a change to the outcome in a rehearing order is “significant.”  In that case, the court urges parties to file a petition with the court, based again on having “reasonable grounds” for not having raised their arguments with the FERC a second time.


1 Smith Lake Improvement and Stakeholders Ass’n v. FERC, No. 13-1074 (D.C. Cir. Sept. 26, 2014). 

2 See Brief for Respondent, Smith Lake Improvement and Stakeholders Ass’n v. FERC, No. 13-1074.

3 Order, Smith Lake Improvement and Stakeholders Ass’n v. FERC, No. 13-1074.

4 The court also reissued the September opinion, amended to recognize that the requirement that requests for rehearing be filed at FERC within 30 days is a statutory, jurisdictional requirement.

5 16 U.S.C. 825l(b) (2012).

6 Smith Lake Improvement and Stakeholders Ass’n v. FERC, No. 13-1074, slip op. at 4 (D.C. Cir. Jan. 30, 2015) (“Amended Order”) (internal quotes omitted) (emphasis added).

7 Id.

8 Statement of Cir. Judges Brown and Wilkins and Senior Cir. Judge Silberman at 2, Smith Lake Improvement and Stakeholders Ass’n v. FERC, No. 13-1074 (quoting Alabama Power Co., 130 FERC ¶ 62,271, at 64,719 (2010)).

9 Id.

10 Tennessee Gas Pipeline Co. v. FERC, 9 F.3d 980, 980 (D.C. Cir. 1993).

11 16 U.S.C. 825l(b).

12 Amended Order at 6.

13 16 U.S.C. 825l(b) (2012).

14 Amended Order at 6-7. 

Share This Insight

Previous Entries

Speaking Energy

March 26, 2026

Antitrust enforcement is showing early signs of transformation as new leadership promises more accommodating approaches to oil & gas consolidation. In the United States, Federal Trade Commission chair Andrew Ferguson assumed office in January 2025, signaling a more permissive stance toward merger approvals that oil & gas companies have welcomed enthusiastically. This shift represents a potential departure from the heightened scrutiny that characterized previous years, creating optimism among dealmakers seeking opportunities for strategic combinations. 

...

Read More

Speaking Energy

March 19, 2026

International trade policy has emerged as a dominant force shaping the oil & gas sector, with sweeping tariffs imposed on products from virtually every nation using authorities including IEEPA, Section 232 and Section 301. President Trump's "America First Trade Policy" leverages duties as negotiation tools to secure bilateral deals featuring significant oil & gas purchase commitments, making trade considerations essential for any cross-border transaction. Energy dominance serves as a cornerstone of the administration's economic and national security strategy, placing the industry squarely in the spotlight. 

...

Read More

Speaking Energy

March 10, 2026

Federal energy regulators are assuming expanded roles as the administration prioritizes energy dominance and infrastructure development to meet unprecedented power demand. FERC Chairman Laura Swett has vowed to expedite data center interconnections while addressing jurisdictional challenges, warning that unmet electricity demand could drive data centers abroad and create national security risks. The agency is processing pipeline applications faster than in prior years and considering blanket authorizations for certain LNG and hydroelectric projects to streamline approvals. 

Pipeline projects previously stalled by Clean Water Act permits are being revitalized, particularly in northeastern states where historically high electricity prices have increased openness to natural gas infrastructure. The Department of Energy is expanding its emergency authority to require retention of generation resources and has granted major LNG export approvals, signaling commitment to expanding U.S. export capacity under a streamlined framework that deprioritizes climate considerations.  

The Administration is bullish on the opportunities for the U.S. energy industry in Venezuela and eager to support companies willing to navigate the political risk inherent in the operations at the moment. Early meetings with President Trump and industry leaders showed the path forward may be longer and more complex than anticipated by the President. 

As permitting reforms advance and the pendulum swings toward fossil fuel favorability, the regulatory and policy landscape is fundamentally reshaping energy infrastructure development timelines and investment opportunities. 

Oil & Gas in 2026: Energy Policy & Regulation 

Delve into the complete regulatory & policy outlook at our Oil & Gas in 2026 report.

...

Read More

Speaking Energy

March 3, 2026

Macroeconomic turbulence and volatile commodity markets significantly influenced oil & gas M&A activity throughout 2025, with deals showing renewed momentum only in the year's second half.  

...

Read More

© 2026 Akin Gump Strauss Hauer & Feld LLP. All rights reserved. Attorney advertising. This document is distributed for informational use only; it does not constitute legal advice and should not be used as such. Prior results do not guarantee a similar outcome. Akin is the practicing name of Akin Gump LLP, a New York limited liability partnership authorized and regulated by the Solicitors Regulation Authority under number 267321. A list of the partners is available for inspection at Eighth Floor, Ten Bishops Square, London E1 6EG. For more information about Akin Gump LLP, Akin Gump Strauss Hauer & Feld LLP and other associated entities under which the Akin Gump network operates worldwide, please see our Legal Notices page.