9th Circuit Erects Statutory Standing Bar to Appeals Challenging FERC Section 211A Orders

Aug 13, 2015

Reading Time : 5 min

While the broader implications of this decision are yet to be determined, the court’s holding could make it more difficult for petitioners who object to FERC orders issued pursuant to Section 211A to mount a challenge to those orders on appeal if their economic or policy interests are not sufficiently aligned with the open access and competitive purposes of Section 211A.

Background

Bonneville markets electricity generated at federal hydroelectric dams in the Pacific Northwest. Bonneville’s customers are primarily public and private utilities that purchase wholesale electricity to serve customer load, including “preference customers,” who have a statutory preference to buy wholesale electricity from Bonneville. Bonneville also operates a large portion of the transmission grid in the Pacific Northwest and provides transmission services and interconnection to public and private power generators. Bonneville is a federal agency, but is self-funded, recovering its costs through rates charged to customers. An increase in Bonneville’s operating costs, therefore, can result in increased rates for Bonneville’s wholesale customers.

In response to a substantial increase in wind generation on Bonneville’s transmission system and anticipated high water levels in the Columbia River Basin (where Bonneville’s dams are located), Bonneville promulgated an Environmental Redispatch Policy (“ER Policy”) in May 2011 (to remain in effect until March 2012) to allow Bonneville to curtail transmission customers’ generation resources during “overgeneration events.”  During such events, environmental limits placed on Bonneville’s hydroelectric resources prevented it from “spilling” excess water flows (rather than sending them through the hydroelectric generating units) to avoid generating additional electricity from those resources. In these circumstances, Bonneville was left with more electricity than the transmission system could accommodate. Bonneville argued that it could not curtail its own generation during such overgeneration events because of the environmental limits on spilling excess flows, requiring it instead to curtail the generation of others on its system. Under the ER Policy, Bonneville curtailed wind generation for more than 200 hours in May and June 2011, resulting in wind generators losing millions of dollars in production tax credits. 

In June 2011, a group of wind generators filed a complaint at FERC against Bonneville, seeking an order requiring Bonneville to revise its ER Policy to comport with the undue discrimination standards of Section 211A of the FPA. Section 211A gives FERC authority to order a transmitting utility that is not otherwise subject to its jurisdiction to provide transmission service “(1) at rates that are comparable to those that the unregulated transmitting utility charges itself; and (2) on terms and conditions . . . comparable to those under which the unregulated transmitting utility provides transmission services to itself and that are not unduly discriminatory or preferential.” 

The wind generators argued that the ER Policy contravened the undue discrimination standards of Section 211A because it provided an undue preference for Bonneville’s own generation, and discriminated against the generation of others, by curtailing non-Bonneville generation in favor of Bonneville’s own hydroelectric generation. Several wholesale energy customers of Bonneville and trade associations intervened at FERC to oppose the relief requested by the wind generators, arguing that, if FERC were to order that Bonneville pay additional compensation to wind generators to remedy any undue discrimination, it would result in higher costs to be passed on to Bonneville’s customers. 

In December 2011, FERC concluded that the ER Policy resulted in noncomparable transmission service that treated non-Bonneville wind generators unfairly. FERC ordered Bonneville to file tariff revisions to address the comparability concerns raised by the wind generators on a prospective basis. FERC later denied rehearing. 

In February 2013, Bonneville, certain wholesale customers of Bonneville and the intervening trade associations filed petitions for review of FERC’s orders in the 9th Circuit. Bonneville, however, complied with FERC’s orders and voluntarily dismissed its petitions before briefing. On appeal, the remaining Petitioners argued that FERC exceeded its statutory authority in issuing the nondiscrimination mandate because Section 211A of the FPA permits only regulation of “transmission services” and not the redispatch or curtailment of generation, and that FERC did not provide sufficient reasoning and consider all the relevant evidence in reaching its decision. 

9th Circuit Decision

The 9th Circuit denied Petitioners’ appeal without reaching the merits of their claims, finding that Petitioners lacked “statutory standing” to challenge FERC’s orders. While the court found that Petitioners satisfied the constitutional standing requirements of Article III (injury in fact, causation and redressibility), the court nonetheless concluded that Petitioners could not satisfy the requirement that they have “statutory standing.”  To demonstrate statutory standing, petitioners must demonstrate that they are “aggrieved” by the FERC orders at issue within the meaning of both Section 313(b) of the FPA and Section 10 of the Administrative Procedure Act (APA). “Aggrievement” under the APA requires that “the interest sought to be protected by the complainant . . . be arguably within the zone of interests to be protected or regulated by the statute in question.” 

The court held that the interests that Petitioners sought to protect were not sufficiently aligned with the interests that Congress sought to protect when it enacted Section 211A of the FPA to satisfy the “zone of interests test” and establish statutory standing. The court found that Section 211A was “designed to foster an open and competitive energy market by promoting access to transmission service on equal terms.”  The interests of Bonneville’s wholesale energy customers were different, according to the court, because they sought to reduce Bonneville’s costs by reducing access to its transmission system during overgeneration events, rather than seeking to “open access and increase competition” as Congress intended. This, according to the court, created a likelihood that Petitioners would “frustrate rather than further” the statutory objectives of Section 211A, rendering Petitioners “unreliable litigants” who are unable to satisfy the “zone-of-interests” test for statutory standing.

Potential Impact on Future Appeals

The court’s holding suggests that, for a party not directly the subject of a FERC order under Section 211A to demonstrate statutory standing to appeal, it must be seeking to “open access and increase competition,” rather than “reduce access.”  This holding, particularly if followed by other courts, could limit statutory standing in appeals of FERC orders issued pursuant to Section 211A to only the unregulated transmission utility subject to FERC’s order, or parties who assert that FERC’s action in the challenged orders did not go far enough to open access to the transmission system and increase competition. Parties claiming to be “aggrieved” by Section 211A orders who are not directly the subject of the order and whose interests do not sufficiently align with the statutory purpose of Section 211A may need to rely on another party — such as the unregulated transmitting utility directly subject to the Section 211A order — to mount a challenge on appeal.  

Share This Insight

Previous Entries

Speaking Energy

August 15, 2025

On August 8, 2025, the Federal Energy Regulatory Commission (FERC) issued an enforcement order in Skye MS, LLC (Skye) and levied a $45,000 civil penalty on an intrastate pipeline operator in Mississippi, resolving an investigation into the operator’s violations of section 311 (Section 311) of the Natural Gas Policy Act (NGPA). FERC faulted the operator for providing a Section 311 transportation service without timely filing a Statement of Operating Conditions (SOC) and obtaining FERC’s approval for the transportation rates. Section 311 permits intrastate pipelines to transport interstate gas “on behalf of” interstate pipelines without becoming subject to FERC’s more extensive Natural Gas Act (NGA) jurisdiction, but requires the intrastate pipeline to have an SOC stating the rates and terms and conditions of service on file with FERC within 30 days of providing the interstate service. Under the NGPA, Section 311 rates must be “fair and equitable” and approved by FERC. In Skye, FERC stated that the operator began providing Section 311 service on certain pipeline segments in Mississippi in May 2023, following their acquisition from another Section 311 operator, but did not file an SOC with FERC until April 2025. The order ties the penalty to the approximately two-year delay between commencement of the Section 311 service and the SOC filing date. The pipeline operator was also ordered to provide an annual compliance report and to abide by additional verification requirements related to the filing of its FERC Form No. 549D, the Quarterly Transportation & Storage Report for Intrastate Natural Gas and Hinshaw Pipelines.

...

Read More

Speaking Energy

August 6, 2025

In Sierra Club v. FERC, No. 24-1199 (D.C. Cir. Aug. 1, 2025), the U.S. Court of Appeals for the District of Columbia Circuit (D.C. Circuit) upheld the Federal Energy Regulatory Commission’s (FERC) approval of a 1,000-foot natural gas pipeline segment crossing the United States-Mexico border (the Border Pipeline) under section 3 of the Natural Gas Act (NGA), rejecting environmental groups’ challenges that FERC improperly limited its analysis under both the NGA and the National Environmental Policy Act (NEPA), as related to a 155-mile intrastate “Connector Pipeline” constructed upstream of the Border Pipeline in Texas.

...

Read More

Speaking Energy

July 17, 2025

On July 15, 2025, the Federal Energy Regulatory Commission (FERC or Commission) issued an order1 proposing to eliminate the soft price cap of $1,000 per megawatt-hour (MWh) for bilateral spot sales in the Western Electricity Coordinating Council (WECC) that was implemented following the California energy crisis. If adopted, the Commission’s proposal would eliminate the requirement that sellers make a filing with FERC cost justifying spot market sales in excess of the soft price cap, which have become increasingly common in recent years as market conditions have continued to tighten throughout the West. Eliminating the WECC soft price cap would provide sellers that make sales during periods when prices exceed the cap greater certainty that their sales will not be second guessed after the fact.

...

Read More

Speaking Energy

June 25, 2025

On June 4–5, 2025, the Federal Energy Regulatory Commission (FERC or Commission) hosted a commissioner-led technical conference to discuss resource adequacy challenges facing regional transmission organizations and independent system operators (RTO). The conference is a response to the growing concern that multiple RTO regions across the country may not have sufficient supply available in the coming years to meet demand due to resource retirements, the pace of new generation entry and higher load growth arising from the construction of data centers and reindustrialization.

...

Read More

Speaking Energy

June 12, 2025

We are pleased to share the presentation slide deck and a recording of Akin’s recently presented webinar, “Navigating U.S. Policy Shifts in the Critical Minerals Sector.”

...

Read More

Speaking Energy

June 10, 2025

On June 4, 2025, the U.S. Department of Transportation’s (DOT) Pipeline and Hazardous Materials Safety Administration (PHMSA) announced revisions to its procedures for pipeline safety enforcement actions. The changes, outlined in two new policy memoranda from PHMSA’s Office of the Chief Counsel (PHC), aim to enhance due process protections for pipeline operators by clarifying how civil penalties are calculated and expanding the disclosure of agency records in enforcement proceedings.

...

Read More

Speaking Energy

May 22, 2025

On May 19, 2025, the Department of Energy (DOE) finalized its 2024 LNG Export Study: Energy, Economic and Environmental Assessment of U.S. LNG Exports (the 2024 Study) through the release of a Response to Comments on the 2024 Study. The Response to Comments concludes that the 2024 Study, as augmented through public comments submitted on or before March 20, 2025, supporting a finding that liquefied natural gas (LNG) exports serve the public interest. With the comment process complete, DOE will move forward with final orders on pending applications to export LNG to non-free trade agreement (non-FTA) countries.

...

Read More

Speaking Energy

May 20, 2025

On Thursday, May 15, the Senate Commerce, Science & Transportation Subcommittee on Surface Transportation, Freight, Pipelines and Safety held a hearing titled, “Pipeline Safety Reauthorization: Ensuring the Safe and Efficient Movement of American Energy.” The hearing examined legislative priorities for reauthorizing the Pipeline and Hazardous Materials Safety Administration (PHMSA).

...

Read More

© 2025 Akin Gump Strauss Hauer & Feld LLP. All rights reserved. Attorney advertising. This document is distributed for informational use only; it does not constitute legal advice and should not be used as such. Prior results do not guarantee a similar outcome. Akin is the practicing name of Akin Gump LLP, a New York limited liability partnership authorized and regulated by the Solicitors Regulation Authority under number 267321. A list of the partners is available for inspection at Eighth Floor, Ten Bishops Square, London E1 6EG. For more information about Akin Gump LLP, Akin Gump Strauss Hauer & Feld LLP and other associated entities under which the Akin Gump network operates worldwide, please see our Legal Notices page.