Congressional Republicans Ask FERC to Rethink PURPA

Nov 9, 2015

Reading Time : 2 min

By: Jason Sison (law clerk - not admitted to practice)

The letter suggests that FERC’s implementation of the Carter-era law needs a comprehensive reevaluation due to the significant developments in the industry over the last few decades. These developments include the maturation of organized wholesale power markets, open access transmission requirements, decreasing prices for natural gas and renewable energy technologies, environmental regulations, integrated resource planning, federal tax credits, renewable portfolio standards and the proliferation of distributed energy resources. The authors of the letter hope that the technical conference can identify necessary regulatory or legislative reforms that recognize the modern electricity marketplace.

The authors—Sen. Lisa Murkowski (R-AK) and Reps. Fred Upton (R-MI) and Ed Whitfield (R-KY) — pointed to concerns about certain PURPA requirements that stakeholders raised in recent testimony before the Senate Energy and Natural Resources Committee and House Energy and Commerce Committee.1  The chairmen specifically cited the testimony of Jonathan M. Weisgall of Berkshire Hathaway Energy, who discussed the risks imposed by long-term, fixed-price contracts mandated by PURPA, many of which Weisgall claimed to be priced well above market.2

The letter requested that the FERC technical conference address several issues, including:

  • whether FERC’s one-mile rule to determine whether facilities are “located at the same site” for determining QF status for small power production facilities has been subject to abuse
  • the treatment of energy imbalance markets as comparable markets for purposes of implementing PURPA’s mandatory purchase requirement
  • the rebuttable presumption that a QF with a capacity at or below 20 MW does not have nondiscriminatory access to the market
  • whether imposing a mandatory purchase obligation is appropriate if an electric utility does not need to acquire capacity from a QF to meet its service obligation
  • whether imposing a mandatory purchase obligation is appropriate if the utility is subject to a state-required integrated resource planning process and a competitive resource procurement process
  • the methods used by states to establish avoided cost rates.

1 Discussion Draft on Accountability and Department of Energy Perspectives on Title IV: Energy Efficiency: Hearing Before the Subcomm. on Energy & Power of the H. Comm. on Energy & Commerce, 114th Cong. (June 3-4, 2015); Energy Infrastructure Legislation: Hearing Before the S. Comm. on Energy & Natural Res., 114th Cong. (May 14, 2015).

2 Hearing Before the S. Comm. on Energy & Natural Res., 114th Cong. (May 14, 2015) (statement of Jonathan M. Weisgall, Vice President, Legislative and Regulatory Affairs, Berkshire Hathaway Energy), available at http://www.energy.senate.gov/public/index.cfm/files/serve?File_id=c956e7a4-70bb-456c-9a4a-f53f42a5ecc8

Share This Insight

Previous Entries

Speaking Energy

February 10, 2026

The global energy sector enters 2026 amid major policy shifts, geopolitical tension and evolving market dynamics. The Trump administration’s reversal of Biden-era climate initiatives and renewed emphasis on domestic production have reshaped the policy landscape, offering a more favorable regulatory environment even as conflicts abroad, oil price volatility and shifting trade policies tempered deal activity through 2025.

...

Read More

Speaking Energy

January 22, 2026

On January 16, 2026, the National Energy Dominance Council (NDEC) and governors from each of the 13 states in PJM issued a Statement of Principles urging PJM Interconnection, L.L.C. (PJM) to hold an emergency backstop auction and take other measures to support the entry of new capacity to preserve the reliability of the PJM region. The Statement of Principles calls on PJM to expeditiously file with the Federal Energy Regulatory Commission (FERC or the Commission) tariff revisions that would overhaul aspects of PJM’s market rules to address rising electricity prices and growing reliability risks in the PJM region. The Statement of Principles comes at a time of growing concern that PJM will not have sufficient capacity in the coming years to meet demand due to the retirement of existing generation resources, the glacial pace of new entry and projected increased demand associated with data center development.

...

Read More

Speaking Energy

December 21, 2025

On December 19, 2025, the Federal Energy Regulatory Commission (FERC or the Commission) issued its much-anticipated order on show cause proceeding concerning the co-location of generation and load within the PJM Interconnection, L.L.C. (PJM) market.[1] In the order, the Commission finds that PJM’s tariff is unjust and unreasonable because it does not provide sufficient clarity on the rates, terms, and conditions of service applicable to generators serving Co-Located Load and does not include transmission services appropriate for customers that are willing and able to limit their use of the transmission system in certain conditions. 

...

Read More

Speaking Energy

November 25, 2025

We are pleased to share the program materials and a recording of Akin’s recently presented webinar, “Navigating the Evolving Landscape of Corporate PPAs.”

...

Read More

© 2026 Akin Gump Strauss Hauer & Feld LLP. All rights reserved. Attorney advertising. This document is distributed for informational use only; it does not constitute legal advice and should not be used as such. Prior results do not guarantee a similar outcome. Akin is the practicing name of Akin Gump LLP, a New York limited liability partnership authorized and regulated by the Solicitors Regulation Authority under number 267321. A list of the partners is available for inspection at Eighth Floor, Ten Bishops Square, London E1 6EG. For more information about Akin Gump LLP, Akin Gump Strauss Hauer & Feld LLP and other associated entities under which the Akin Gump network operates worldwide, please see our Legal Notices page.