Creating A Regulatory Framework For Demand-Side Investment Equivalent To Generation & Grid Investments

Jul 11, 2014

Reading Time : 1 min

We believe that for DSM solutions to be successful over the long term, they must both serve the needs of the end-use customer and support the utility’s business model.  To date, we have not seen a model for demand-side products or programs that adequately addresses the needs of both the utility and the consumer in a manner that is also attractive to state regulators.  This paper proposes a regulatory framework for a new demand-side product that is coming of age:  fully automated demand-side technology (Automated Demand Side Management or ADSM).  ADSM delivers a physical asset to the utility that is operationally equivalent to a peaking power plant.  As such, we believe it could, and it should, receive regulatory treatment equal to a generation unit.  We have applied traditional ratemaking principles to existing regulatory structures to create a compensation mechanism for ADSM that is a “regulatory equivalent” to that for peaking generation.  We hope this modified regulatory model will encourage utilities to see improving demand-side resources as an alternative equivalent to supply-side options.

Not all DSM is the same and not all DR is the same.  Although demand-side efforts have a long and rich history throughout the world, the past twenty years have resulted in dramatic technological advances in demand-side solutions.  Debate about DR products often groups all products that reduce demand together, from simple phone calls and radio ads asking consumers to conserve, to two-way automated, verifiable load management systems.  But recognition of the distinct differences among these products would allow all of them to be used more effectively to maintain a reliable electric grid.

To read the full publication, please click here.


1   See “Negawatt Hour,” Economist, Mar. 1, 2014, available at http://www.economist.com/news/business/21597922- energy-conservation-business-booming-negawatt-hour. 

Share This Insight

Previous Entries

Speaking Energy

December 21, 2025

On December 19, 2025, the Federal Energy Regulatory Commission (FERC or the Commission) issued its much-anticipated order on show cause proceeding concerning the co-location of generation and load within the PJM Interconnection, L.L.C. (PJM) market.[1] In the order, the Commission finds that PJM’s tariff is unjust and unreasonable because it does not provide sufficient clarity on the rates, terms, and conditions of service applicable to generators serving Co-Located Load and does not include transmission services appropriate for customers that are willing and able to limit their use of the transmission system in certain conditions. 

...

Read More

Speaking Energy

November 25, 2025

We are pleased to share the program materials and a recording of Akin’s recently presented webinar, “Navigating the Evolving Landscape of Corporate PPAs.”

...

Read More

Speaking Energy

November 12, 2025

On November 7, 2025, the New York Department of Environmental Conservation (NYSDEC) and the New Jersey Department of Environmental Protection (NJDEP) reversed their prior positions and approved Clean Water Act (CWA) Section 401 Water Quality Certifications and other environmental permits for the Transcontinental Gas Pipeline Company’s (Transco) Northeast Supply Enhancement Project (NESE). NESE is a 25-mile natural gas pipeline expansion project certificated by the Federal Energy Regulatory Commission (FERC) that is intended to deliver 400,000 dekatherms per day of natural gas produced in Pennsylvania to local distribution company customers in New York City through new facilities in Middlesex County, New Jersey and an underwater segment traversing the Raritan and Lower New York Bays.

...

Read More

Speaking Energy

November 6, 2025

The market for the direct procurement of energy by commercial and industrial buyers has been active in the U.S. for a decade.  In years past, buyers often engaged in such purchases on a voluntary basis to achieve their goals to use renewable energy.  These days, C&I buyers are turning to direct procurement or self-supply to obtain a reliable source of energy.  Sufficient and accessible energy from a local utility may not be available or may be materially delayed or trigger significant capital costs.  This is a material change driven in part by increased demand for electricity, including demand from data centers, EV infrastructure and industrial development.       

...

Read More

© 2025 Akin Gump Strauss Hauer & Feld LLP. All rights reserved. Attorney advertising. This document is distributed for informational use only; it does not constitute legal advice and should not be used as such. Prior results do not guarantee a similar outcome. Akin is the practicing name of Akin Gump LLP, a New York limited liability partnership authorized and regulated by the Solicitors Regulation Authority under number 267321. A list of the partners is available for inspection at Eighth Floor, Ten Bishops Square, London E1 6EG. For more information about Akin Gump LLP, Akin Gump Strauss Hauer & Feld LLP and other associated entities under which the Akin Gump network operates worldwide, please see our Legal Notices page.