FAQs Expiration of 30 Percent ITC After 2016

Nov 18, 2014

Reading Time : 3 min

2. Absent a change in law, what ITC will be available for homeowners who install and own solar on their own homes on January 1, 2017?

Answer:  None.2

3. Absent a change in law, what percentage of the ITC will be available for an investor (e.g., a bank) that invests in a solar system installed on a home and leased (or subject to a power purchase agreement) to the homeowner on January 1, 2017?

Answer:  Ten percent.  (In the case of a solar system owned by an investor (i.e., not a homeowner), the tax law does not distinguish between residential, commercial or utility scale systems.3)

4. What happens to the five-year accelerated depreciation (so-called MACRS) available for solar systems on January 1, 2017?

Answer:  As a general matter, nothing happens to MACRS on January 1, 2017, because it is a “permanent” provision of the Internal Revenue Code.4 However, the MACRS benefit will effectively increase as the ITC decreases. This is because depreciable basis is reduced by half of the ITC. When the ITC declines to 10 percent, the depreciated basis will be reduced by only 5 percent (i.e., half of 10 percent), rather than 15 percent (i.e., half of 30 percent).

5. Is MACRS available to homeowners who own solar systems installed on their own homes?

Answer:  Such homeowners are not eligible for MACRS (or any other type of depreciation) because depreciation is available for property used only in a trade or business.5 A solar system installed on your own residence is not used in a trade or business; accordingly, it is not eligible for MACRS (or any other type of depreciation).  This is the case under current tax law and will be the case on and after January 1, 2017.

6. What is the solar industry’s strategy for maintaining the 30 percent ITC?

Answer:  The strategy has two parts.  The first part is seeking an extension of the 30 percent ITC. The second part is seeking to change the deadline from projects “placed in service” before the end of 2016 to projects that “start construction” prior to 2017.6

7. What is the origin of the “start of construction” concept?

Answer:  It was first used as one aspect of the deadline for projects seeking cash grants.7  In the American Taxpayer Relief Act of 2012, the production tax credit for wind was extended for projects that started construction before January 1, 2012.8

8. What would “start of construction” mean as a practical matter?

Answer:  The Internal Revenue Service, for the production tax credit, has interpreted “start of construction” to mean either (a) spending 5 percent and taking delivery of the purchased equipment within three and a half months of payment or (b) starting work of a “significant physical nature.” For more details, see the blog post available here.

9. If the 30 percent ITC is not extended, what changes are likely to occur in solar tax equity transactions?

Answers:  MARCS will be more important. The most effective way to monetize MACRS is through a sale-leaseback, so that structure is likely to be more popular.  The pass-through and inverted lease structures are ITC-focused, so they will likely decline in popularity.

Further, there has been a recent increase in interest in homeowners owning the solar systems on their homes. For instance, SolarCity has launched a traditional lending program for homeowners. If no tax credits are available for homeowners, the interest in ownership of solar systems by homeowners will likely decline in favor of leases and power purchase agreements in which an investor can claim tax credits and depreciation and, as a result, provide a reduced rate to the homeowner.


1 I.R.C. § 48(a)(2)(A)(i)(II), (ii).

2 I.R.C. § 25D(g)

3 I.R.C. § 48(a)(2)(A)(i)(II), (ii).

4 See I.R.C. § 168.

5 I.R.C. §§ 167(a), 168(a).  If the homeowner were selling all of the electricity into the grid and using none itself, it is arguable that the system would be viewed as used in a trade or business and eligible for MACRS and the ITC under Section 48 (not Section 25D).  See Michael Copley, Rooftop Solar Group Hopes IRS Request Will Chip Away at Solar Tariffs, SNL (Sept. 26, 2014).  However, the use of the ITC and MACRS would be subject to the “passive activity loss” rules, which would be a significant constraint for most homeowners.

6 See Renewable Energy Parity Act of 2013 (H.R. 2502) sponsored by Rep. Mike Thompson (D-CA).  Senators Michael Bennett (D-CO) and Dean Heller (R-NV) support similar legislation.

7 § 1603 (a)(2) of the American Recovery and Reinvestment Tax Act of 2009 (“but only if the construction of such project began….”).

8 § 707 of the Tax Relief, Unemployment Insurance Reauthorization, and Job Creation Act of 2012.

Share This Insight

Previous Entries

Speaking Energy

August 15, 2025

On August 8, 2025, the Federal Energy Regulatory Commission (FERC) issued an enforcement order in Skye MS, LLC (Skye) and levied a $45,000 civil penalty on an intrastate pipeline operator in Mississippi, resolving an investigation into the operator’s violations of section 311 (Section 311) of the Natural Gas Policy Act (NGPA). FERC faulted the operator for providing a Section 311 transportation service without timely filing a Statement of Operating Conditions (SOC) and obtaining FERC’s approval for the transportation rates. Section 311 permits intrastate pipelines to transport interstate gas “on behalf of” interstate pipelines without becoming subject to FERC’s more extensive Natural Gas Act (NGA) jurisdiction, but requires the intrastate pipeline to have an SOC stating the rates and terms and conditions of service on file with FERC within 30 days of providing the interstate service. Under the NGPA, Section 311 rates must be “fair and equitable” and approved by FERC. In Skye, FERC stated that the operator began providing Section 311 service on certain pipeline segments in Mississippi in May 2023, following their acquisition from another Section 311 operator, but did not file an SOC with FERC until April 2025. The order ties the penalty to the approximately two-year delay between commencement of the Section 311 service and the SOC filing date. The pipeline operator was also ordered to provide an annual compliance report and to abide by additional verification requirements related to the filing of its FERC Form No. 549D, the Quarterly Transportation & Storage Report for Intrastate Natural Gas and Hinshaw Pipelines.

...

Read More

Speaking Energy

August 6, 2025

In Sierra Club v. FERC, No. 24-1199 (D.C. Cir. Aug. 1, 2025), the U.S. Court of Appeals for the District of Columbia Circuit (D.C. Circuit) upheld the Federal Energy Regulatory Commission’s (FERC) approval of a 1,000-foot natural gas pipeline segment crossing the United States-Mexico border (the Border Pipeline) under section 3 of the Natural Gas Act (NGA), rejecting environmental groups’ challenges that FERC improperly limited its analysis under both the NGA and the National Environmental Policy Act (NEPA), as related to a 155-mile intrastate “Connector Pipeline” constructed upstream of the Border Pipeline in Texas.

...

Read More

Speaking Energy

July 17, 2025

On July 15, 2025, the Federal Energy Regulatory Commission (FERC or Commission) issued an order1 proposing to eliminate the soft price cap of $1,000 per megawatt-hour (MWh) for bilateral spot sales in the Western Electricity Coordinating Council (WECC) that was implemented following the California energy crisis. If adopted, the Commission’s proposal would eliminate the requirement that sellers make a filing with FERC cost justifying spot market sales in excess of the soft price cap, which have become increasingly common in recent years as market conditions have continued to tighten throughout the West. Eliminating the WECC soft price cap would provide sellers that make sales during periods when prices exceed the cap greater certainty that their sales will not be second guessed after the fact.

...

Read More

Speaking Energy

June 25, 2025

On June 4–5, 2025, the Federal Energy Regulatory Commission (FERC or Commission) hosted a commissioner-led technical conference to discuss resource adequacy challenges facing regional transmission organizations and independent system operators (RTO). The conference is a response to the growing concern that multiple RTO regions across the country may not have sufficient supply available in the coming years to meet demand due to resource retirements, the pace of new generation entry and higher load growth arising from the construction of data centers and reindustrialization.

...

Read More

Speaking Energy

June 12, 2025

We are pleased to share the presentation slide deck and a recording of Akin’s recently presented webinar, “Navigating U.S. Policy Shifts in the Critical Minerals Sector.”

...

Read More

Speaking Energy

June 10, 2025

On June 4, 2025, the U.S. Department of Transportation’s (DOT) Pipeline and Hazardous Materials Safety Administration (PHMSA) announced revisions to its procedures for pipeline safety enforcement actions. The changes, outlined in two new policy memoranda from PHMSA’s Office of the Chief Counsel (PHC), aim to enhance due process protections for pipeline operators by clarifying how civil penalties are calculated and expanding the disclosure of agency records in enforcement proceedings.

...

Read More

Speaking Energy

May 22, 2025

On May 19, 2025, the Department of Energy (DOE) finalized its 2024 LNG Export Study: Energy, Economic and Environmental Assessment of U.S. LNG Exports (the 2024 Study) through the release of a Response to Comments on the 2024 Study. The Response to Comments concludes that the 2024 Study, as augmented through public comments submitted on or before March 20, 2025, supporting a finding that liquefied natural gas (LNG) exports serve the public interest. With the comment process complete, DOE will move forward with final orders on pending applications to export LNG to non-free trade agreement (non-FTA) countries.

...

Read More

Speaking Energy

May 20, 2025

On Thursday, May 15, the Senate Commerce, Science & Transportation Subcommittee on Surface Transportation, Freight, Pipelines and Safety held a hearing titled, “Pipeline Safety Reauthorization: Ensuring the Safe and Efficient Movement of American Energy.” The hearing examined legislative priorities for reauthorizing the Pipeline and Hazardous Materials Safety Administration (PHMSA).

...

Read More

© 2025 Akin Gump Strauss Hauer & Feld LLP. All rights reserved. Attorney advertising. This document is distributed for informational use only; it does not constitute legal advice and should not be used as such. Prior results do not guarantee a similar outcome. Akin is the practicing name of Akin Gump LLP, a New York limited liability partnership authorized and regulated by the Solicitors Regulation Authority under number 267321. A list of the partners is available for inspection at Eighth Floor, Ten Bishops Square, London E1 6EG. For more information about Akin Gump LLP, Akin Gump Strauss Hauer & Feld LLP and other associated entities under which the Akin Gump network operates worldwide, please see our Legal Notices page.