In Sierra Club v. FERC, No. 24-1199 (D.C. Cir. Aug. 1, 2025), the U.S. Court of Appeals for the District of Columbia Circuit (D.C. Circuit) upheld the Federal Energy Regulatory Commission’s (FERC) approval of a 1,000-foot natural gas pipeline segment crossing the United States-Mexico border (the Border Pipeline) under section 3 of the Natural Gas Act (NGA), rejecting environmental groups’ challenges that FERC improperly limited its analysis under both the NGA and the National Environmental Policy Act (NEPA), as related to a 155-mile intrastate “Connector Pipeline” constructed upstream of the Border Pipeline in Texas.

Critically, the court embraced the U.S. Supreme Court’s Seven County Infrastructure Coalition v. Eagle County (Seven County) precedent, holding that FERC’s scope-of-review decisions were entitled to “substantial deference” so long as they fell within a “broad zone of reasonableness” and bore a “reasonably close causal relationship” to the federal action at issue. Applying Seven County, the court emphasized that FERC was not obligated to assess upstream or downstream environmental impacts—such as emissions from the broader pipeline—because those effects were not within its control or causally linked to its decision concerning the Border Pipeline. The court reiterated that judicial review of NEPA compliance must defer to the agency’s determination of the scope of its environmental analysis, provided it reasonably addresses the direct effects of the project at hand. This furthered the Seven County principle that NEPA does not serve as a substantive barrier to agency action, but rather ensures informed decision making within the bounds of agency authority.

The court also rejected the notion that the Connector Pipeline was subject to FERC jurisdiction under section 7 of the NGA, relying on precedent related to another Texas intrastate pipeline providing limited interstate service under section 311 of the Natural Gas Policy Act.

Implications for Judicial Review of Future FERC Orders

The ruling marks the first time a panel of judges on the D.C. Circuit embraced Seven County as applied to FERC pipeline reviews conducted under the NGA. It is a marked departure from prior D.C. Circuit decisions that curtailed NGA permits on NEPA sufficiency grounds, which Akin explained in a prior client alert on Seven County. Prior cases held that agencies should assess environmental effects of upstream or downstream projects outside of the agency’s jurisdiction as part of indirect and cumulative impact analyses for pipeline and energy infrastructure projects. If the court’s new line of reasoning holds, litigation risks to project developers may lessen. It could also expedite approvals for energy projects by reducing the scope of an agency’s NEPA review, which may have been expanded to reduce an agency’s reversal risk in court.

The decision indicates that going forward, environmental groups will face a higher bar in challenging FERC’s environmental documents. Unless they can show that FERC’s scoping decisions fall outside a “broad zone of reasonableness” or ignore impacts with a “reasonably close causal relationship” to the federal action, their claims may not overcome this reinforced deference standard. This could lead to fewer successful NEPA challenges in the D.C. Circuit, long considered a key venue for environmental litigation.

Share This Insight

Previous Entries

Speaking Energy

March 19, 2026

International trade policy has emerged as a dominant force shaping the oil & gas sector, with sweeping tariffs imposed on products from virtually every nation using authorities including IEEPA, Section 232 and Section 301. President Trump's "America First Trade Policy" leverages duties as negotiation tools to secure bilateral deals featuring significant oil & gas purchase commitments, making trade considerations essential for any cross-border transaction. Energy dominance serves as a cornerstone of the administration's economic and national security strategy, placing the industry squarely in the spotlight. 

...

Read More

Speaking Energy

March 10, 2026

Federal energy regulators are assuming expanded roles as the administration prioritizes energy dominance and infrastructure development to meet unprecedented power demand. FERC Chairman Laura Swett has vowed to expedite data center interconnections while addressing jurisdictional challenges, warning that unmet electricity demand could drive data centers abroad and create national security risks. The agency is processing pipeline applications faster than in prior years and considering blanket authorizations for certain LNG and hydroelectric projects to streamline approvals. 

Pipeline projects previously stalled by Clean Water Act permits are being revitalized, particularly in northeastern states where historically high electricity prices have increased openness to natural gas infrastructure. The Department of Energy is expanding its emergency authority to require retention of generation resources and has granted major LNG export approvals, signaling commitment to expanding U.S. export capacity under a streamlined framework that deprioritizes climate considerations.  

The Administration is bullish on the opportunities for the U.S. energy industry in Venezuela and eager to support companies willing to navigate the political risk inherent in the operations at the moment. Early meetings with President Trump and industry leaders showed the path forward may be longer and more complex than anticipated by the President. 

As permitting reforms advance and the pendulum swings toward fossil fuel favorability, the regulatory and policy landscape is fundamentally reshaping energy infrastructure development timelines and investment opportunities. 

Oil & Gas in 2026: Energy Policy & Regulation 

Delve into the complete regulatory & policy outlook at our Oil & Gas in 2026 report.

...

Read More

Speaking Energy

March 3, 2026

Macroeconomic turbulence and volatile commodity markets significantly influenced oil & gas M&A activity throughout 2025, with deals showing renewed momentum only in the year's second half.  

...

Read More

Speaking Energy

February 24, 2026

On February 19, 2026, the Federal Energy Regulatory Commission (FERC) issued an order rescinding the soft price cap for bilateral spot market energy sales in the Western Electricity Coordinating Council (WECC) region.1 As previously covered, on July 15, 2025, FERC initiated a Federal Power Act Section 206 proceeding following the D.C. Circuit’s decision finding that FERC must apply the Mobile-Sierra public interest standard before ordering refunds for above-cap bilateral sales and vacating FERC’s orders requiring refunds for certain bilateral spot market transactions in the WECC region that exceeded the $1,000 MWh soft price cap.2 FERC’s Order follows through on the proposal it made last July to eliminate the WECCs soft price cap and marks a recognition that Western wholesale markets have evolved over the past two decades to become sufficiently competitive to render the soft price cap unnecessary.  

...

Read More

© 2026 Akin Gump Strauss Hauer & Feld LLP. All rights reserved. Attorney advertising. This document is distributed for informational use only; it does not constitute legal advice and should not be used as such. Prior results do not guarantee a similar outcome. Akin is the practicing name of Akin Gump LLP, a New York limited liability partnership authorized and regulated by the Solicitors Regulation Authority under number 267321. A list of the partners is available for inspection at Eighth Floor, Ten Bishops Square, London E1 6EG. For more information about Akin Gump LLP, Akin Gump Strauss Hauer & Feld LLP and other associated entities under which the Akin Gump network operates worldwide, please see our Legal Notices page.